New air hoses, New air bellows, New Teflon tape, Changed the order of the belts, 2 new potentiometers, Changed the input air pressure regulator, New oil in the vacuum pump, New silicone strips under the welding beams, 1 new switch for emergency stop, Renovated/cleaned vacuum and pressure valve.