New air hoses, New air bellows, New Teflon tape, Changed the order of the belts, 2 new potentiometers, Changed the input air pressure regulator, New oil in the vacuum pump, New silicone strips under the welding beams, 1 new switch for emergency stop, Renovated/cleaned vacuum and pressure valve.
Changed oil and oil filter. New locking mechanisms (x2) for the hatch to the engine compartment, 1 better used welding beam (modified), New welding wires and tape on the welding beams, New connectors to the welding beam New rubber seal for the lid, New screen part, Aligned the lid, Changed tires,
Welded and milled arms for the counterweights and arranged locking mechanism for the axles, Sealed all possible sources of leakage with silicone and welded crack in the table. Vacuum value: 6-7mbar both sides
Change the oil Replace welding tape Change silicone strip Replace lid seal Vacuum value 7
Change oil and filter Welding beam renovated